CNC transformer Oil Duct Bonding Machine oil duct strip sticking machine

Transformer cooling duct arrangement wherein the transformer winding sections are encompassed by an inner and outer insulating oil barrier and inner and outer blocks are employed to direct the oil flow in a labyrinth path throughout the winding sections. Our company oil duct bonding machine is an intelligent machine capable of arranging, gluing and pressing the strips onto epoxy dotted paper/insulating paper. This machine is controlled by computer program and thus has high precision.

Wechat
 
Collect
Description

The story of Transformer oil Duct Sticking Machine

At present, the production mode of oil duct processing production lines in various transformer companies is the traditional manual processing mode, that is, firstly, manually sort the oil duct brace to make it meet the processing requirements, then brush rubber on the brace, and then put the oil duct brace into the positioning slot of the slot mold, and press the stuck strut with the compression block for about one minute, and then roll up the stay curtain. The efficiency of the production mode is low, and the quality fluctuation is large; the product quality is greatly affected by manual work, and the field operation environment is messy, which does not meet the needs of modern production. Our company oil duct bonding machine can realize the automatic control of the whole processing process of the oil duct stay curtain, so as to realize the unmanned oil channel processing, and fundamentally solve the fundamental problems such as the low efficiency of the oil duct stay curtain processing, the large fluctuation of the quality, and the large artificial factors affecting the product quality.

Equipment composition

The equipment includes the following:

1) discharging mechanism, 2) push mechanism, 3) gluing mechanism, 4) mounting mechanism, 5) pressing moving mechanism, 6) auxiliary pressing mechanism, 7) unwinding mechanism, 8) winding mechanism, 9) heating mechanism

NoClassificationProperties

A5 model

1Operating propertiesStrip feedingManually put, automatically straighten out the strip
2
Correctionyes
3
Length120-620
4
Width5-10
5
Thickness2.5-10
6
Bonding speed40/min
7
Spacing error(mm)0.02
8
GluePVA / white latex
9
Working time36
10
Gas source requirement200l/min,≥0.5mpa
11Mechanical propertyDevice size2000-850-1650
12
Device weight420
13
Part surfaceAnodized + white zinc
14Electrical PropertyPower kw5
15
Voltage220VAC-single phase


FAQ

Payment & Delivery

Payment term : L/C,T/T,Western Union

Delivery time : 90 working days after advance

Guarantee: The guarantee period shall be 12 months counting from the date of signing the Acceptance Report of this machine at the end-user’s site,but no longer than 14 months from the date of delivery.

What is YIBO?

8A Class Transformer Home with a full solution for the Transformer Industry

1, A real manufacturer with complete in-house facilities and passed ISO9001:2020 quality control system.

2, A professional R&D Center, having collaboration with well-know Shandong University.

3. A top performance company Certificated with International Standards like ISO, CE, SGS and BV etc.

4, A better cost-efficient supplier , all key components are international brands like Simens, Schneider and Mitsubishi etc.

5, A reliable business partner, served for  CASC,CRRC,CASDY,ABB,DELIXI, EATON, RITZ,TENGEN, Russia Military Enterprise etc in past 23 years.

6. A factory has passed the global TOP 500 enterprise clients inspection.

7. A market share in China is over 85% and Top 3 in electrical equipment field.

8. A have mainly manufacture the whole of electrical equipment and technical output service for decades.


Q1: How to grantee the quality ?

The quality is approved by national certificate ,several senior inspection personnel ,the brand material supplier ensure the safety and reliability of everything from storage to finished the goods .

Q2:Do you provide overseas installation and training ?

A: It’s optional .Our company will provide the guidance and videos for installation and commissioning.

If you need ,we can send engineers for for overseas installation and training.

Q3:How long is the warranty ?

A:The warranty period is 12 months .During Any problems ,our company will respond within 24 hours .






PRODUCTS
More

YIBO

PRODUCTS

Gaoxin Industry Park, Pingxiang City, Jiangxi Province, China.

yibomachinery@163.com

info@yibowindingmachine.com

0086  15979221627

0086 18967276177

WHAT'S APP 

CONTACTS

×
seo seo