|
Mechanical PressWith the rapid development of stamping processing, the thickness and strength of customer coils have been greatly improved. Many customers have stamped coils with a thickness of over 3.0mm. At this time, they are using the common precision leveling machines and half-cut leveling machines on the market. The actual effect cannot be achieved. The thick plate leveling machine is a new type of leveling machine developed to solve the difficulty of leveling thick plate materials for customers. To solve the problem of the traditional leveling machine’s limited pressure on the plate, low precision and low discharge In the design of the thick plate leveling machine, the traditional spring-type leveling adjustment method is changed to the turbine-worm type leveling adjustment. Leveling makes it easy to operate, high precision, and greatly improves the output rate of the leveler.
![]()
Collect
Product Description
1. The operation method of the thick plate leveler: 1. First open the material-feeding and flattening cylinder so that the material-feeding and flattening roller is in the elevated position, and then open the material-feeding and pressing cylinder to the relaxed position. Worm gear fine-tuning device, adjust the height so that the upper and lower rollers are slightly larger than the thickness of the plate. 2. Put the material head into the feed-in and flattening roller and press down the flattening cylinder to bend and straighten the material head and then open the flattening cylinder to send the material forward to the feed-in roller, press down and compress the air pump to feed the material The roller presses the material, and at this time, the switch of the electric control box is switched to the manual position, and the material is slowly fed in by pressing the inch button. After the material is fed into the leveling machine for a short period of time, check the leveling condition of the material. If it is downward bending "leveling and downward bending", it means that the pressing amount is not enough. Adjust the fine-tuning device to press down. If it is upward bending "flattening upward bending", it means that the material pressure is too large, adjust the fine-tuning device to rise, and repeat the adjustment until it is straight. 2. Precautions for the use of thick plate leveling machine: Thick plate leveling machine structure diagram 1. Before starting the leveler, make sure that its center line is consistent with the center line of the punch die. 2. When using the thick plate leveling machine, the scope of use (ie width and thickness requirements) must not be exceeded. The operator must master its operating essentials before operating, and must operate in strict accordance with the instructions (included), and pay attention to the use of It is safe, and you must pay attention to the operation of the entire production line when using it. If there is any abnormality, you must stop the punch immediately, and then stop the leveling and feeding device. 3. The thick plate leveling machine has two operating modes: manual and automatic. In the manual state, the feeding and retreating of materials can be controlled through two actions of "forward rotation" and "reverse rotation", which are mainly used for machine adjustment and test. Mould: In the automatic action state, the material and leveling device are inductively controlled by the 24V induction frame, which can automatically control the start and stop of the leveler. When automatic continuous stamping is required, the selector switch must be in the "automatic" position, otherwise, the leveling machine will not run automatically and the punch will pull the material, which will cause dangers such as damage to the mold. FAQ
Payment & Delivery Payment term : L/C,T/T,Western Union Delivery time : 90 working days after advance Guarantee: The guarantee period shall be 12 months counting from the date of signing the Acceptance Report of this machine at the end-user’s site,but no longer than 14 months from the date of delivery. What is YIBO? 8A Class Transformer Home with a full solution for the Transformer Industry 1, A real manufacturer with complete in-house facilities and passed ISO9001:2020 quality control system. 2, A professional R&D Center, having collaboration with well-know Shandong University. 3. A top performance company Certificated with International Standards like ISO, CE, SGS and BV etc. 4, A better cost-efficient supplier , all key components are international brands like Simens, Schneider and Mitsubishi etc. 5, A reliable business partner, served for CASC,CRRC,CASDY,ABB,DELIXI, EATON, RITZ,TENGEN, Russia Military Enterprise etc in past 23 years. 6. A factory has passed the global TOP 500 enterprise clients inspection. 7. A market share in China is over 85% and Top 3 in electrical equipment field. 8. A have mainly manufacture the whole of electrical equipment and technical output service for decades. Q1: How to grantee the quality ? The quality is approved by national certificate ,several senior inspection personnel ,the brand material supplier ensure the safety and reliability of everything from storage to finished the goods . Q2:Do you provide overseas installation and training ? A: It’s optional .Our company will provide the guidance and videos for installation and commissioning. If you need ,we can send engineers for for overseas installation and training. Q3:How long is the warranty ? A:The warranty period is 12 months .During Any problems ,our company will respond within 24 hours . |