|
|
CNC Concentric Film Wrapping & High-Frequency Sintering Machine for Transformer Wires (10-80mm²)The CNC Concentric Film Wrapping & High-Frequency Sintering Machine delivers precision insulation for transformer windings. Its continuous production line integrates pay-off, straightening, polishing, dual concentric taping heads, high-frequency sintering (with infrared sensor & water cooling), triple high-temperature pressing, radiation furnaces, and cooling/drying. Key advantages: ±0.2mm wrapping pitch accuracy, 1000 rpm taping, 45kW HF power, and robust caterpillar traction (500kg pull). Ensures uniform coating, excellent dielectric performance, and high throughput for 10–80 mm² section materials.
Collect
Description
1. Core Features & Advantages ① Dual Concentric Taping Heads Two 1-head/1-film concentric taping heads ensure precise overlapping. Rated speed 1000 rpm/min; wrapping pitch drift ≤±0.2mm. Film width 10–130mm, bobbin Φ330mm outer/Φ76mm inner. ② High-Frequency Sintering & Pressing Removable HF generator (45kW max, 360–420V 3-phase) with infrared sensor, water recycling (0.2–0.3MPa), and three high-temp quadrilateral pressure devices plus two small radiation furnaces. Delivers superior fusion and surface smoothness. ③ Integrated Pretreatment & Post-Treatment Felt locator, straightening (10 nylon rollers, Φ47mm), polishing dust removal, hot air dry (5kW + 0.25kW fan), cooling water groove, and final hot air dry. Ensures clean, moisture-free, high-quality output. ④ Heavy-Duty Pay-off & Traction PS-800 lift-type pay-off (plunger clamping, 800kg max). Caterpillar traction with pneumatic clamping (Φ90mm rollers, 320mm contact, 500kg max pull). Roller metering and take-up for continuous operation. ⑤ Automation & Safety PLC electric control, pneumatic clamping, safety interlocks, and enclosed design (transparent cover). Left-to-right feed (right enter, left exit). Supply 415V 50Hz (main), HF 360–420V. 2. Key Technical Parameters
3. Application & Benefits
4. Quality Assurance & Manufacturer Service (YIBO Machinery)
→ Contact our engineering team for custom conductor sizes, film widths, or integrated transformer insulation production lines. FAQ
Payment & Delivery Payment term : L/C,T/T,Western Union Delivery time : 90 working days after advance Guarantee: The guarantee period shall be 12 months counting from the date of signing the Acceptance Report of this machine at the end-user’s site,but no longer than 14 months from the date of delivery. What is YIBO? 8A Class Transformer Home with a full solution for the Transformer Industry 1, A real manufacturer with complete in-house facilities and passed ISO9001:2020 quality control system. 2, A professional R&D Center, having collaboration with well-know Shandong University. 3. A top performance company Certificated with International Standards like ISO, CE, SGS and BV etc. 4, A better cost-efficient supplier , all key components are international brands like Simens, Schneider and Mitsubishi etc. 5, A reliable business partner, served for CASC,CRRC,CASDY,ABB,DELIXI, EATON, RITZ,TENGEN, Russia Military Enterprise etc in past 23 years. 6. A factory has passed the global TOP 500 enterprise clients inspection. 7. A market share in China is over 85% and Top 3 in electrical equipment field. 8. A have mainly manufacture the whole of electrical equipment and technical output service for decades. Q1: How to grantee the quality ? The quality is approved by national certificate ,several senior inspection personnel ,the brand material supplier ensure the safety and reliability of everything from storage to finished the goods . Q2:Do you provide overseas installation and training ? A: It’s optional .Our company will provide the guidance and videos for installation and commissioning. If you need ,we can send engineers for for overseas installation and training. Q3:How long is the warranty ? A:The warranty period is 12 months .During Any problems ,our company will respond within 24 hours . |