750kVA/350kV AC High Voltage Test System for Transformers & Insulators (Withstand / PD / Dielectric Loss)
Ensure absolute reliability in high-voltage equipment with YIBO’s 750kVA/350kV AC High Voltage Test System. Engineered for transformer manufacturers and electrical labs, this integrated system performs critical AC withstand voltage, PD, and dielectric loss measurements. Featuring the YWDT-700/350 testing transformer, TRF capacitive divider, DBK compensating reactor, and intelligent AC-2000 measurement & control, it delivers precise, repeatable results. Designed for indoor operation (altitude <1000m, -10~+40°C), it combines 23+ years of YIBO expertise with ISO/CE standards, trusted by ABB, CRRC, and CASC. Ideal for switchgear, insulators, and instrument transformers.
No price
Wechat
Collect
Description
1. Core Features & Advantages
Comprehensive Testing: AC withstand voltage, Partial Discharge (PD), dielectric loss (tanδ), and other HV tests.
Complete System Integration: Includes testing transformer, voltage regulator, capacitive divider, compensating reactor, protective resistor, filter, and AC-2000 control system.
High Precision & Safety: Low waveform distortion (<3%), reliable grounding (<0.5Ω), anti-earthquake ≤Class 7, with front/rear LV switch cabinets.
Humidity: ≤90% at 25℃; Max daily temp difference 15℃
Atmospheric Humidity: 11g/m³
Environment: Indoor, no conductive dust, no fire/explosion risk, no corrosive gas
Power: 380V, sine waveform distortion <3%
Grounding: Reliable, resistance <0.5Ω
5. Quality Control & Manufacturer Service (YIBO)
QC: Strict raw material standards → High-precision component processing → Assembly recheck → Pre-shipment full HV testing.
Certifications: ISO9001:2020, CE/SGS/BV. Key components from Siemens/Schneider/Mitsubishi.
Track Record: 23+ years, 85%+ China market share (Top 3). Served CASC, CRRC, ABB, EATON, DELIXI, RITZ, TENGEN, Russia Military Enterprise.
Payment & Delivery: L/C, T/T, Western Union; ~90 working days after advance.
Warranty: 12 months (from Acceptance Report, max 14 months from delivery).
Support: Optional overseas installation & training, 24-hour response, video guidance.
→ Contact our engineering team for custom HV test system configurations (capacity, voltage, PD requirements) for your transformer or insulator testing needs.