|
|
CNC Multi-Strip Paperboard Slitting & Chamfering Machine for Transformer Oil DuctEngineered for distribution transformer insulation, this multi-stick paperboard forming machine combines strip slitting and dual-side chamfering (arc edges) into one automated process. It produces 10–20 oil duct sticks per feed with burr-free, smooth surfaces. Delivering 5× productivity and 20% material savings, it features semi-auto dual-shaft feeding, adjustable tool shafts, plate thickness adjustment (3–15mm), and an integrated cooling/dust-removal system with bag filter. Ideal for transformer spacer blocks with straight/swallow-tail slots.
Collect
Description
1. Core Features & Advantages ① Slitting & Chamfering Integration One-time forming of multi-strips (10–20 pcs) with arc chamfers on both sides. Eliminates secondary processing, ensures smooth, burr-free surfaces for superior transformer insulation. ② High Efficiency & Material Savings At least 5× more efficient than single-strip forming machines, with 20% higher material utilization rate. Discharging speed 5–10 m/min; max 22 strips per discharge. ③ Precision & Flexibility Handles stick thickness 3–15mm, width 5–70mm, max feeding width 150mm. Each tool shaft adjustable; plate thickness adjustment function for varied insulation board specs. ④ Semi-Automatic & Safe Feeding Front and rear dual driving shafts enable automatic, smooth feeding. Semi-automatic feeding system with safety dustproof cover ensures operator safety and stable production. ⑤ Cooling & Dust Removal System Equipped with cooling, dust removal, and bag filter to extend blade life, reduce dust, and maintain workshop cleanliness. ⑥ Transformer-Specific Output Finished strips used for oil duct, spacer blocks with straight or swallow-tail slots—critical for transformer insulator manufacturing. 2. Key Technical Parameters
3. Application & Benefits
4. Quality Assurance & Manufacturer Service (YIBO Machinery)
→ **Contact our engineering team for custom strip widths (5–70mm), thickness (3–15mm), or integrated transformer insulation production lines. FAQ
Payment & Delivery Payment term : L/C,T/T,Western Union Delivery time : 90 working days after advance Guarantee: The guarantee period shall be 12 months counting from the date of signing the Acceptance Report of this machine at the end-user’s site,but no longer than 14 months from the date of delivery. What is YIBO? 8A Class Transformer Home with a full solution for the Transformer Industry 1, A real manufacturer with complete in-house facilities and passed ISO9001:2020 quality control system. 2, A professional R&D Center, having collaboration with well-know Shandong University. 3. A top performance company Certificated with International Standards like ISO, CE, SGS and BV etc. 4, A better cost-efficient supplier , all key components are international brands like Simens, Schneider and Mitsubishi etc. 5, A reliable business partner, served for CASC,CRRC,CASDY,ABB,DELIXI, EATON, RITZ,TENGEN, Russia Military Enterprise etc in past 23 years. 6. A factory has passed the global TOP 500 enterprise clients inspection. 7. A market share in China is over 85% and Top 3 in electrical equipment field. 8. A have mainly manufacture the whole of electrical equipment and technical output service for decades. Q1: How to grantee the quality ? The quality is approved by national certificate ,several senior inspection personnel ,the brand material supplier ensure the safety and reliability of everything from storage to finished the goods . Q2:Do you provide overseas installation and training ? A: It’s optional .Our company will provide the guidance and videos for installation and commissioning. If you need ,we can send engineers for for overseas installation and training. Q3:How long is the warranty ? A:The warranty period is 12 months .During Any problems ,our company will respond within 24 hours . |